Aecon Home >> Estimate a Project

Estimate A Project

Please use return the form below to get more information about our design/build, architectural and construction management services.

Be assured that we do not sell, rent, or share client information. We respect your privacy as much as we value your business.


All highlighted fields are required.

Contact Information

Name of Company:
Contact Name:
Phone Number:
E-mail Address:
SIC Code:

Building Details

Desired move-in date:
Building Location:
City State/Province Country
Existing Utilities at Site:



Distance of building to road: ft.
Number of employees:
Production and warehouse employees
employees
Employees on Largest Shift: employees
Number of Parking Spaces:
Intended Building Use:
New Construction Area: sq. ft.
Existing Construction Area: sq. ft.
Renovations: sq. ft.
Finished Office Area: sq. ft.
Finished Production Area: sq. ft.
Finished Warehouse Area: sq. ft.
Total Building Area:
New and Existing
sq. ft.
Finished Building Dimensions:
Length: ft.
Width: ft.
Height: ft.
Will Aecon obtain site plan approval?
Full Site Area: acres
Will there be a mezzanine?
(open 2nd story in shop area)

Floor Load: lbs.
Clear Height: ft.
Above: ft.
Below: ft.
Shop Lighting Level:


Special concrete floor finish:



Overhead crane required?
Span: ft.
Capacity: tons
Run: ft.
Industrial Equipment:
To be installed or moved

Total Tonnage: tons
Special Floor Features:


Office Space Finish Quality:


Number of Windows Desired: windows
Average Windows Size: sq. ft.
Will there be skylights?
Total Area of Skylights: sq. ft.
Are Forklifts Used?
Anywhere in the building

Number of Lifts: per day
Loaded Weight: lbs.
Wheel Spacing: ft.
Will there be racks?
In the production/warehouse space

Will they be supplied and installed by the owner?
Loading Cap: lbs. per sq. ft.
Height: ft.
Shelf Spacing - Vertical: in.
Shelf Spacing - Horizontal: in.
Loading Docks Required?
Number of Docks: in.
Additional Requirements:

Production/Warehouse Space Heated?
Heated Temp. Required: Fahrenheit
Production/Warehouse Space Cooled?
Cooled Temp. Required: Fahrenheit
Humidity Control Required?
Required Humidity: % - %
Electrical Power Required:
In total
Amps
Volts
Industrial Process Power Required?
Process Amps: Amps
Process Volts: Volts
industrial
commercial
institutional
residential
architect
architectural
builder
building design
construction manager
general contractor
construction consultant
project manager
design/build
civil engineers
facility planning
process design
process installation
equipment rigging
material handling
pre-engineered
steel building
value engineering
church
aircraft hangar
machine shop
injection molding
paper converting
refinery
garage
water processing
paint spray booth
barn
timber frame
historic renovations
historic restoration
chemical
warehouse
estimating
construction
renovation
restoration
Alabama
Connecticut
Massachusetts
Rhode Island
Westchester
Texas
Vietnam